| 14 Oct 2025 |
Sami Liedes | And I see that happen in practice with my builds; some serialized configure gets throttled because lots of derivations build, then it runs out of derivations and waits until that is finished, and then explodes again. | 17:15:45 |
Vladimír Čunát | Hydra has so much work that critical path matters little in practice. | 17:16:03 |
Vladimír Čunát | (Hundreds of thousands jobs.) | 17:16:28 |
K900 | At Hydra scale the critical path finishes long before we're out of work in pretty much all cases | 17:17:07 |
Sami Liedes | Right. That I can imagine (and is what I asked for :). So not building e.g. only a single architecture of a single channel helps presumably a lot. | 17:17:06 |
Vladimír Čunát | No, that's not it. | 17:17:29 |
Vladimír Čunát | Architectures mostly don't share hardware. | 17:17:45 |
K900 | Hydra mostly always has overlapping loads | 17:17:56 |