| 23 Oct 2025 |
Philip Taron (UTC-8) | hell yeah | 16:04:06 |
Vladimír Čunát | It's in. | 16:04:07 |
ElvishJerricco | Philip Taron (UTC-8): thanks for the comment in the systemd room last week letting me know that was needed :P | 16:06:56 |
| cameronraysmith joined the room. | 18:52:19 |
K900 | Can someone that knows ocaml fix the merge conflict on next -> staging | 20:13:49 |
| 24 Oct 2025 |
Wolfgang Walther | I don't know OCaml, but was involved in one of the two conflicting PRs. Will have a look. | 07:04:18 |
K900 | Merges are still failing btw | 18:08:12 |
Winter | still ocaml? | 18:24:35 |
Winter | can take a peek | 18:24:37 |
| 25 Oct 2025 |
Yureka (she/her) | since the last staging-next merge my ssh sessions are extremely sluggish to unusable. new text does not appear until I press some more keys | 06:59:43 |
K900 | There's a weird openssh bug with multiplexing | 07:01:08 |
K900 | @Lily Foster found it the other day | 07:01:14 |
Yureka (she/her) | I do use multiplexing | 07:01:20 |
Yureka (she/her) | controlMaster | 07:01:27 |
K900 | It's fixed in openssh master already | 07:02:14 |
K900 | So we should have it with the next update | 07:02:20 |
K900 | AFAIUI | 07:02:22 |
Yureka (she/her) | If you have a link to the bug or patch in openssh that would be wonderful | 07:03:33 |
K900 | Hold on | 07:04:26 |
K900 | Need to find it | 07:04:28 |
K900 | https://github.com/openssh/openssh-portable/commit/beae06f56e0d0a66ca535896149d5fb0b2e8a1b4 supposedly | 07:05:10 |
Vladimír Čunát | openssh isn't a terribly huge rebuild. | 07:05:29 |
Vladimír Čunát |
Rebuild: linux 2264, darwin 982
| 07:06:08 |
ivy | when is the next staging to next | 08:16:05 |
Vladimír Čunát | In about a week I'd expect to start a new staging-next. | 08:16:58 |
aloisw | In reply to @k900:0upti.me It's fixed in openssh master already 10.2 has the fix already, and can be grafted. | 13:56:36 |
emily | there's not a strict schedule, we generally rotate between stable and unstable (and oldstable for the painful couple of months where we support that) with maybe a day or two between them to let Hydra catch up on the release channels | 14:01:53 |
emily | and it takes something like 10 days to build the average unstable cycle but it's usually lengthened by fixing important regressions etc. | 14:02:16 |
emily | a rough metric is that something merged into staging should generally reach master within 2–4 weeks depending on the timing and how cycles go | 14:03:15 |
| 26 Oct 2025 |
| winston joined the room. | 21:08:37 |