!UNVBThoJtlIiVwiDjU:nixos.org

Staging

312 Members
Staging merges | Running staging cycles: https://github.com/NixOS/nixpkgs/pulls?q=is%3Apr+is%3Aopen+head%3Astaging-next+head%3Astaging-next-25.05 | Review Reports: https://malob.github.io/nix-review-tools-reports/108 Servers

Load older messages


SenderMessageTime
23 Oct 2025
@philiptaron:matrix.orgPhilip Taron (UTC-8)hell yeah16:04:06
@vcunat:matrix.orgVladimír ČunátIt's in.16:04:07
@elvishjerricco:matrix.orgElvishJerricco Philip Taron (UTC-8): thanks for the comment in the systemd room last week letting me know that was needed :P 16:06:56
@cameronraysmith:matrix.orgcameronraysmith joined the room.18:52:19
@k900:0upti.meK900Can someone that knows ocaml fix the merge conflict on next -> staging20:13:49
24 Oct 2025
@wolfgangwalther:matrix.orgWolfgang WaltherI don't know OCaml, but was involved in one of the two conflicting PRs. Will have a look.07:04:18
@k900:0upti.meK900Merges are still failing btw18:08:12
@winter:catgirl.cloudWinterstill ocaml?18:24:35
@winter:catgirl.cloudWintercan take a peek18:24:37
25 Oct 2025
@yuka:yuka.devYureka (she/her)since the last staging-next merge my ssh sessions are extremely sluggish to unusable. new text does not appear until I press some more keys06:59:43
@k900:0upti.meK900There's a weird openssh bug with multiplexing07:01:08
@k900:0upti.meK900 @Lily Foster found it the other day 07:01:14
@yuka:yuka.devYureka (she/her)I do use multiplexing07:01:20
@yuka:yuka.devYureka (she/her)controlMaster07:01:27
@k900:0upti.meK900It's fixed in openssh master already07:02:14
@k900:0upti.meK900So we should have it with the next update07:02:20
@k900:0upti.meK900AFAIUI07:02:22
@yuka:yuka.devYureka (she/her)If you have a link to the bug or patch in openssh that would be wonderful07:03:33
@k900:0upti.meK900Hold on07:04:26
@k900:0upti.meK900Need to find it07:04:28
@k900:0upti.meK900https://github.com/openssh/openssh-portable/commit/beae06f56e0d0a66ca535896149d5fb0b2e8a1b4 supposedly07:05:10
@vcunat:matrix.orgVladimír Čunátopenssh isn't a terribly huge rebuild.07:05:29
@vcunat:matrix.orgVladimír Čunát

Rebuild: linux 2264, darwin 982

07:06:08
@ivy:faggot.shivywhen is the next staging to next08:16:05
@vcunat:matrix.orgVladimír Čunát In about a week I'd expect to start a new staging-next. 08:16:58
@aloisw:julia0815.dealoisw
In reply to @k900:0upti.me
It's fixed in openssh master already
10.2 has the fix already, and can be grafted.
13:56:36
@emilazy:matrix.orgemilythere's not a strict schedule, we generally rotate between stable and unstable (and oldstable for the painful couple of months where we support that) with maybe a day or two between them to let Hydra catch up on the release channels14:01:53
@emilazy:matrix.orgemilyand it takes something like 10 days to build the average unstable cycle but it's usually lengthened by fixing important regressions etc.14:02:16
@emilazy:matrix.orgemily a rough metric is that something merged into staging should generally reach master within 2–4 weeks depending on the timing and how cycles go 14:03:15
26 Oct 2025
@winston:winston.shwinston joined the room.21:08:37

Show newer messages


Back to Room ListRoom Version: 6